Back to site

©2024. All rights reserved.
Crafted by 4Property.

Sterilisation Facility/Laboratory Facility at Unit D, Clyda Business Park, Mallow, Co. Cork


Type
Office

Status
Sold

Size
1,210 sq.m.

BER
BER
G
BER No: 800336679
EPI: 867.68 kWh/m2/yr

Brochure
View Now

Description

Newly designed Sterilisation Facility/Laboratory Facility/Clean Room built to a very high specification available for immediate occupation. This purpose built, state of the art facility is highly accessible, situated in a strategic location just off the N20 Cork to Limerick route. The subject unit is a two storey detached unit extending to approximately 13,024 sq ft. Internally, the building comprises of a contemporary, professionally designed sterilisation unit on the ground floor with an open plan area suitable for offices on the first floor. Located in Clyda Business Park, the unit is conveniently situated adjacent to Quartertown Industrial Estate along with IDA Business & Technology Park, just 2km from the town of Mallow which offers easy access to bus & rail links. There are 12 No. Dedicated car parking spaces on site, with additional spaces available if required.

Non-Technical Specification within the unit:
Plumbing System:
-The building is fed off the pressurised mains.
-The incoming mains water feeds a sectional cold water storage tank and associated booster set located in the mechanical tank room on the ground floor.
-The hot and cold-water system is pressurised through the booster set.
Hot water is generated by a hot water storage tank located in the mechanical plantroom at first floor level. This is served by the gas boilers.
-A hot water return pump and circuit has been provided.

Heating System:
-There are 2 no. wall mounted condensing gas boilers that serve the low-pressure hot water system.
-The heating system feeds the following;
Radiators in the common areas.
Re-heat batteries on the duct system.
Air Handling Unit heating coils.
Hot water tank.
-There is a Fulton packaged steam boiler system complete with onboard controls, blowdown system and feed tank.

Heating Ventilation & Air Conditioning (HVAC):
-The ground floor is served with a central Air Handling Unit (AHU) complete with HEPA filtration for cleanroom applications.
-The system is designed to provide controlled temperatures to 4 no. distinct zones, using duct mounted re-heat batteries.
-The Air Handling Unit has Variable Speed Drives for flexibility and energy efficiency.
-The toilet block has a separate dedicated extract system.

Cooling System:
-The Air Handling Unit has an integral cooling coil.
-The chilled piping/pump system is in place ready to accept an external ground mounted chiller.

Controls:
-A Building Management System is in place to control all plant.

Power:
-The building has a dedicated electrical room with main ESB incomer, providing flexibility in the level of ESB supply.
-There are 3 no. sub-distribution boards.
-Power and data is provided in line with the previous building use.
-A communications room and associated server rack is located at first floor level.

Electricity:
-Cleanroom type light fittings have been provided to the ground floor process areas.
-General lighting has been provided elsewhere to suit room functions.
-Emergency lighting is provided.

Other Services:
-A fire alarm system is provided.
-An intruder alarm system is provided.
-A lift shaft is in situ for future lift installation

Strategic Location:
-Excellent connectivity to gateway cities of Cork, Limerick and Dublin.
-Daily hourly train service to Dublin & Cork.
-Daily bus services to Cork, Limerick, Shannon Airport, Galway and Dublin.
-40 minutes to Cork International Airport.

Skills Availability:
3rd level graduates within a 30-45minute commute from the following educational institutions: University College Cork, Cork Institute of Technology, University of Limerick, and Limerick Institute of Technology.

Additional documentation available on request:
-Existing Site Survey
-Fire Safety Certificate
-Fire Safety Certificate Submission & Drawings
-Full Suite of Mechanical Layouts
-Boiler House Control Panel Schematics
-Window, Door & Ceiling Schedule
-Electrical Layouts
-BER Report
-Grant of Planning Permission
-Additional Floor Plans

While care has been taken to ensure that information contained in Liam Mullins & Associates publications is correct at the time of publication, changes in circumstances after the time of publication may impact the accuracy of this information.

Privacy Policy

Pagespeed Optimization by Lighthouse.